Scumboard Performance Analysis
Price: £100
Ref: 99/WW/08/8
ISBN: 1 84057 184 5
A performance evaluation was carried out to assess the influence on the total solids retention efficiency and the water depth in a side weir CSO chamber when changes were made to the position of a scumboard within the chamber. All tests were completed at the National CSO Test Facility at Wigan Wastewater Treatment Works. Similar measurements were made when a Rotomat ROK1 6mm mesh screen was installed horizontally to the downstream face of a side weir. Tests were completed with and without the scumboard in position for a series of inflow magnitudes and ratios of the continuation flow to inflow.
Customers who bought this report also bought...
CSO Performance evaluation: Results of a field programme to assess the total solids retention efficiency performance of side weir and stilling pond chambers
97/WW/08/1 - ISBN: 1 84057 025 3Studies the total solids efficiency performance of four combined sewer overflow chambers at the national CSO testing facility. They were tested under controllable and repeatable flow conditions using real sewage. Describes th... More...
Price: £100
Using computational fluid dynamics to assess the impact of an anti- blockage device on the flow regime and solids retention efficiency of a stilling pond combined sewer overflow
97/WW/08/3 - ISBN: 1 84057 026 1Uses a computational fluid dynamics model to investigate the flow pattern retention efficiency of a stilling pond combined sewer overflow chamber with and without an anti-blocking device. Examines the importance of the device... More...
Price: £100
Screen Efficiency (Novel Devices)
99/WW/08/6 - ISBN: 1 84057 183 7This report describes the total solids retention efficiency of four innovative novel screen arrangements. These were, the Yorkshire Water Flexible Screen, the Thames Water Drum Screen, the Pipe screen with two different mesh ... More...
Price: £150
Flow Control Devices for CSOs
99/WW/08/9 - ISBN: 1 84057 186 1The setting of a CSO structure is a primary design parameter. Ideally the flow control device which is used to restrict the flow to the treatment works should maintain a constant flow to the works irrespective of the depth of... More...
Price: £150
©